We supply and install four heat pump models — sized to suit your hot tub, your garden and your budget.
A standard hot tub heater converts electricity straight into heat — which is expensive. An air-source heat pump works like a reverse fridge, extracting warmth from the surrounding air and transferring it to your water. For every unit of electricity used, a good heat pump typically produces four to six units of heat.
The result is noticeably lower running costs — particularly valuable if you use your hot tub through winter.
Efficiency
COP 4–6 typical
Installation
Typically 1 day
Works down to
Down to -5°C (IceSpa: -15°C)
Survey & quote
Price on request
The figures below are illustrative estimates based on industry COP averages and UK electricity rates. Your actual saving depends on tub size, usage pattern and ambient temperatures — but the direction is always the same.
Illustrative estimates only. Based on 2024 UK average electricity rates (~28p/kWh), 1,500L hot tub at 37°C, COP 4.5. We're happy to work through specific numbers for your setup.
75%
Typical reduction
in heating costs
2–4yr
Typical payback
period
COP 6
Peak efficiency
on warmer days
The right heat pump size depends on your hot tub volume, how you use it, and where it sits. Here's a practical guide — we'll always confirm during a free survey.
Not ideal for exposed positions, year-round winter use or tubs over 1,500L
Most popular choice for Lincolnshire's climate
Whisper-quiet at ~45dB — roughly the same as a quiet conversation
Also the right call when a smaller unit has previously struggled to maintain temperature
Not sure which model? Send us your hot tub make and model, approximate volume, photos of your equipment bay and garden position. We can specify the right unit from that in most cases — no site visit needed upfront.
Most installations are completed in a single visit. Here's how it works from first contact to a running heat pump.
Step 1
Assessment & recommendation
We assess your setup remotely where possible — send us photos and video of your hot tub, equipment bay and available space and we'll specify the right unit in most cases. Where a physical assessment is needed (more complex installs or larger volumes), a paid site visit is arranged. We'll confirm which approach suits your setup when you get in touch.
Upload photos & videosStep 2
Unit ordered, date confirmed
Once you're happy to proceed we order your unit and confirm an installation date. Typical lead times are 3–7 days depending on model and availability.
Step 3 — fitting day
Installation & commissioning
We position the unit, make the plumbing connections via the bypass kit, connect the electrics, and commission the heat pump. Your hot tub is back in use the same day.
Duration
3–5 hours typically
What we need
Access to tub & outdoor power
Step 4
Handover & aftercare
We walk you through operating the heat pump, optimal temperature settings and seasonal tips. We're on hand after installation if you have questions.
All prices below include standard supply and fitting. If your installation requires anything additional, we'll explain this clearly before you commit.
Not sure which model is right for you? Tell us your hot tub make and model, where it's located and how often you use it — we'll give you a recommendation with no obligation to buy.